Automatic MTTA, MTTR and MTBF
The clock starts when the machine stops, not when someone opens a ticket. The indicators come from the real event, so nobody has to defend their number.
“Maintenance and production keep blaming each other.”
MTTA, MTTR and MTBF calculated from the machine's actual event, not from what somebody remembered while filling in the log. Recurring failures surface on their own.
The clock starts when the machine stops, not when someone opens a ticket. The indicators come from the real event, so nobody has to defend their number.
Every intervention is linked to the stop that caused it, who handled it and what was replaced. The log stops being a notebook running parallel to reality.
The same failure mode repeating on the same machine groups itself. That's the input for deciding what to redesign instead of what to repair again.
When Kinnil CM is on, the machine's deviation feeds straight into the maintenance plan: work gets scheduled by real state and not only by calendar.
MTTO needs no separate install: if the machine is already connected for OEE or for condition, the module switches on over that same data. It's a software decision, not a new project.
If it's the first module you turn on, the install is the same as any other — 1 day per machine, without stopping production, with a 120 V outlet as the only physical requirement.
They all run on the same data and the same hardware. Turn on one, turn on six — the bill grows per machine, not per module.
15–20% more productivity
Plants where OEE and maintenance run together and production data feeds the maintenance plan.
It can, or it can coexist. What Kinnil contributes is the hard data of the event — when the machine stopped, how long until it was attended and how long until it produced again — which is exactly what a CMMS usually receives keyed in by hand.
Not for starting and stopping the clock: the machine measures that. What people contribute is the cause and the description of the intervention, which is where their judgement does add value.
Yes. The platform exposes PDF and Excel reports and ERP integration so the data also lives where the operation is already administered.
We install on 1–2 machines, measure your real baseline and present the findings with your own data. Success criteria agreed from day one.