32+ variables straight from the PLC
MODBUS TCP/IP, RS485 and analog signals. What the PLC already computes stops being locked inside the cabinet.
“I don't have data I can trust.”
The layer that makes everything else possible: it reads your PLCs' variables, normalises them and turns them into alerts and reports. And where there's no PLC to read, it measures anyway.
MODBUS TCP/IP, RS485 and analog signals. What the PLC already computes stops being locked inside the cabinet.
Current, vibration, temperature, pressure, RPM and vision. A twenty-year-old machine with no PLC delivers data just like a new one — that's our ideal case, not the exception.
The Nidus gateway decides in the plant and runs without a connection. If the link drops, the measurement isn't lost: it syncs when it comes back.
Transmission goes over Kinnil's own 4G cellular channel. We don't ask for access to your control systems or consume your bandwidth.
DAQ is what physically goes into the plant and what every other module runs on. That's why installing it well decides whether the rest is useful: a badly taken signal contaminates every number that comes after it.
A typical line is fully measuring in under 2 weeks, at 1 day per machine and without stopping production. The only physical requirement is a 120 V power outlet.
They all run on the same data and the same hardware. Turn on one, turn on six — the bill grows per machine, not per module.
Smart equipment from the factory
Manufacturers integrating data acquisition at the factory and shipping their equipment already measuring.
Yes — that's our ideal case. Non-invasive peripheral sensors: we read current, vibration and vision without touching the machine, which loses no warranty.
No. Kinnil equipment processes on site and transmits over its own channel. Your network and your control systems stay untouched.
The Nidus keeps measuring and processing in the plant, because it runs without a connection. When the channel comes back, the information syncs and the history stays complete.
We install on 1–2 machines, measure your real baseline and present the findings with your own data. Success criteria agreed from day one.