Skip to content
Customers in operation

What happens when a plant finally gets measured

Three different operations, the same pattern: first the data nobody had shows up, then the decision that couldn't be made. These are the numbers from customers running today in Mexico.

Results, not promises

Case studies: OEE in manufacturing and mining

Numbers from real customers, operating in Mexico today.

Manufacturing15–20% more productivity

Full lines running OEE, maintenance and condition. Customers like Siegwerk, GCC, FAMA, Novamex and EZ AIR.

See the case →
Mining20 h/day of unproductive time exposed

A mill instrumented in 1 day with specific energy and AI: a scientific setpoint of 14.15 kWh/ton and mill states in real time.

See the La Plomosa case →
OEM · Oil & GasSmart equipment from the factory

Manufacturers shipping their equipment with remote monitoring built in — without building their own software.

See the case →

Trusted by

  • SIEGWERK
  • GCC
  • FAMA
  • NOVAMEX
  • EZ AIR
  • PROESMMA
How to read these numbers

Not a single figure here is a projection

Data from real deployments in Mexico. The exact impact on your plant is measured by the pilot — with your own data.

The next step

It's not about buying anything.
It's about measuring your most problematic machine.

Kinnil Pilot · 30 days

We install on 1–2 machines, measure your real baseline and present the findings with your own data. Success criteria agreed from day one.

I'd rather write on WhatsApp →