Full lines running OEE, maintenance and condition. Customers like Siegwerk, GCC, FAMA, Novamex and EZ AIR.
See the case →Customers in operation
What happens when a plant finally gets measured
Three different operations, the same pattern: first the data nobody had shows up, then the decision that couldn't be made. These are the numbers from customers running today in Mexico.
Results, not promises
Case studies: OEE in manufacturing and mining
Numbers from real customers, operating in Mexico today.
Manufacturing15–20% more productivity
Mining20 h/day of unproductive time exposed
A mill instrumented in 1 day with specific energy and AI: a scientific setpoint of 14.15 kWh/ton and mill states in real time.
See the La Plomosa case →OEM · Oil & GasSmart equipment from the factory
Manufacturers shipping their equipment with remote monitoring built in — without building their own software.
See the case →Trusted by
How to read these numbers
Not a single figure here is a projection
Data from real deployments in Mexico. The exact impact on your plant is measured by the pilot — with your own data.
The next stepIt's not about buying anything.
It's not about buying anything.
It's about measuring your most problematic machine.
Kinnil Pilot · 30 days
We install on 1–2 machines, measure your real baseline and present the findings with your own data. Success criteria agreed from day one.